Arnold Gauge designs automated measurement systems for applications that need repeatable inspection of one or many part features within the production flow.

Integrated inspection
Match automation to the process
Automation can range from a guided operator sequence to robot loading, multiple measurements, data collection, and process feedback. The right level depends on the part, cycle time, risk, and existing equipment.
- Multiple feature and station checks
- Manual, conveyor, or robotic part presentation
- Clear pass/fail and measurement results
- Data output and traceability requirements
- Integration with upstream or downstream equipment
Application review
Plan around more than the measurement
Part and tolerance
Critical features, datum strategy, contact access, part condition, and the accuracy required.
Handling and cycle
Loading method, orientation, throughput, changeover, reject handling, and operator interaction.
Controls and data
Results display, machine communication, data retention, traceability, and process feedback.
Build the right inspection concept
Tell us how the part moves through production.
Send the part print, target cycle time, required measurements, and details about the current line or machine.